Interface: NDOT District 1 MCO Dispatch - RTC Transit Paratransit Dispatch

NDOT District 1 MCO Dispatch to RTC Transit Paratransit Dispatch Interface Diagram

Architecture Flow Definitions

current infrastructure restrictions  (Planned)  Applicable ITS Standards

Restrictions levied on transportation asset usage based on infrastructure design, surveys, tests, or analyses. This includes standard facility design height, width, and weight restrictions, special restrictions such as spring weight restrictions, and temporary facility restrictions that are imposed during maintenance and construction.

equipment maintenance request  (Planned)  Applicable ITS Standards

Identification of field equipment requiring repair and known information about the associated faults.

equipment maintenance status  (Planned)  Applicable ITS Standards

Current status of field equipment maintenance actions.

maint and constr work plans  (Planned)  Applicable ITS Standards

Future construction and maintenance work schedules and activities including anticipated closures with anticipated impact to the roadway, alternate routes, anticipated delays, closure times, and durations.

road weather information  (Planned)  Applicable ITS Standards

Road conditions and weather information that are made available by road maintenance operations to other transportation system operators.

roadway maintenance status  (Planned)  Applicable ITS Standards

Summary of maintenance fleet operations affecting the road network. This includes the status of winter maintenance (snow plow schedule and current status).

work plan feedback  (Planned)  Applicable ITS Standards

Comments and suggested changes to proposed construction and maintenance work schedules and activities. This information influences work plan schedules so that they minimize impact to other system operations and the overall transportation system.

work zone information  (Planned)  Applicable ITS Standards

Summary of maintenance and construction work zone activities affecting the road network including the nature of the maintenance or construction activity, location, impact to the roadway, expected time(s) and duration of impact, anticipated delays, alternate routes, and suggested speed limits. This information may be augmented with images that provide a visual indication of current work zone status and traffic impacts.